A Travel and vacations forum. TravelBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » TravelBanter forum » Travel Regions » USA & Canada
Site Map Home Authors List Search Today's Posts Mark Forums Read Web Partners

Vietnam war - A legendary of the Ho Chi Minh Trail



 
 
Thread Tools Display Modes
  #1  
Old February 10th, 2009, 07:11 AM posted to rec.travel.usa-canada
Active Travel Vietnam
external usenet poster
 
Posts: 64
Default Vietnam war - A legendary of the Ho Chi Minh Trail

The so-called Ho Chi Minh Trail is one of the most renowned legends
of the Vietnam War. So far, there have been many people outside
Vietnam who have only superficial knowledge on the road system winding
along the Truong Son Range, that facilitated movement of soldiers and
war supplies from North Vietnam to battlefields in South Vietnam. The
Trail was playing the key role in the Communist victory over South
Vietnam.

In the early 2000, the Communist government in Hanoi decided to
construct a highway, the Ho Chi Minh Highway, along the Truong Son
Range to connect North Vietnam with South Vietnam, parallel to the
existing Highway 1 in the coastal areas of Central Vietnam. The
construction is going on, and would be completed in four years if
everything goes as planned.

Prompted by tales of the formidable Ho Chi Minh Trail, many
journalists and observers outside Vietnam quickly adopt the false
notion that the new highway is built on the Ho Chi Minh Trail, or the
Trail is reborn and rebuilt as Ho Chi Minh Highway, without giving it
a second thought.

In fact, the old trail and the new highway ARE NOT AT THE SAME
LOCATION BUT MILES APART.

The Ho Chi Minh Trail was a complex of parallel truck routes and foot
paths.

Most truck routes were dirt roads, some important portions were paved
with rock and pebbles. All of them were in the territory of Laos and
not a bit of it touched the Vietnamese soil except for the first part
of about 50 kilometers from the starting points.

Most convoys departed at three major loading areas inside North
Vietnam’s panhandle region and began their journey by heading to the
Laotian borders, following the three paved highways built before 1945
by the French colonialist authorities in Indochina. All the three
roads connect the Vietnam’s provinces of Nghe An, Ha Tinh and Quang
Binh with the Laotian road network across the common border.

On April 5, 2000, Hanoi government held the ground breaking ceremony
at a ferry harbor in Quang Binh province, to launch the construction
of the Ho Chi Minh Highway. The Xuan Son ferry harbor was one of the
three starting points of the Ho Chi Minh Trail (the southernmost part
of North Vietnam, close to the 17th Parallel - see the map below).

After a short distance into Laos, the trucks headed southward on the
routes along the border. Most of the routes are a few kilometers away
from the border. Far away to the south, the distance may be up to more
than 100 kilometers, deep into Cambodia. The truck routes extended as
far as to Sihanoukville, or Konpong Som, the Cambodian port city on
the Gulf of Thailand. Military supplies also came from North Vietnam
and China to this port to be forwarded to secret bases inside
Cambodia, supporting VC units in South Vietnam. Therefore, the
southern portion of the system was called Sihanouk Trail.

Footpaths made up another system that intertwined with truck routes.
On those footpaths, North Vietnamese combat units moved on foot from
many starting points in areas just north of the Demilitarized Zone
into Laos before infiltrating South Vietnam. Supplies, especially
during the first few years of the war, were also transported to the
South by "dan cong" (civilian labors) on backpacks and mostly on
bicycles led by porters' hands.

Footpaths also extended logistical lines from truck routes. Military
supplies were unloaded from trucks at many sites along the truck
routes and carried by porters on backpacks or on bicycles across
border into South Vietnamese soil.

Like truck routes, footpaths run mostly on Laotian territory parallel
with the border. Only segments of the paths were in South Vietnam no-
man's borderland areas west of Kontum, Pleiku, Ban Me Thuot... down to
Tay Ninh.

Footpath network branched off to the east at many places, leading
supplies and troops to logistical bases set up inside South Vietnam.
Some were located as far as 50 kilometers from the border, deep into
the jungles of Central Vietnam provinces.

The under-construction highway, Ho Chi Minh Highway, is of a
completely different story. It is built entirely inside Vietnam
parallel to the border but not the smallest bit of it is on any
segment of the Ho Chi Minh Trail, truck routes or footpaths. The new
highway intersects with dozen of branched footpaths but runs far away
from the Trail and the border.

The highway construction is not a brand new plan. The idea of the
second north-south highway was nourished by the French colonialist
authorities in the early 20th Century. Before 1954, Highway 14 was
asphalted from its southern end at the Highway 13 (Saigon-Loc Ninh) to
Ban Me Thuot. Its section from Ban Me Thuot up to Daksut, north of
Kontum City, was not asphalted until 1963. The highway from Dak Sut to
Kham Duc was still a 2-lane dirt road.

In 1959, South Vietnam President Ngo Dinh Diem ordered to widen and
reinforce the dirt road to extend the highway from Dak Pek (north of
Dak Sut) to Ben Giang, Quang Nam (70 km southwest of Da Nang). It
would have gone further to A Shau valley and beyond, possibly to Khe
Sanh area. But the outbreak of war in 1961 closed down the project.

The highway now under construction is made up with the existing
Highway 14 that needs some repair after 25 years of poor maintenance;
its extension where abandoned dirt roads require intensive
reconstruction; existing dirt roads from Ben Giang, in A Shau Valley
and other areas that need major upgrading; and the remaining portions
that construction units must open up entirely new roads.

The new highway construction has been opposed by many officials in
Hanoi and deputies of its National Assembly when the plan was
introduced by former Hanoi Prime Minister Vo Van Kiet a few years ago.
The plan would require a budget of nearly US$ 5 billion. In early
2000, Hanoi government decided to go on with the plan which had been
simplified to lower the budget to 3.5 billion dollars. Such budget
seems inadequate to the construction of a highway crossing areas of
heavy rains which often cause floods and landslides.

The Truong Son Trail, or Ho Chi Minh Trail, was a great military
success of the Communists. Massive firepower of the American and South
Vietnamese armed forces failed to stem flows of materiel, supplies and
troops into South Vietnam. Many South Vietnamese strategists contended
that bombings, sporadic land operations or electronic barrier so-
called "McNamara Line" would fail to interdict the enemy movement on
the Trail. According to them, only a defense line of several infantry
divisions across the border, reaching the Mekong River in Laos could
have been effective.

The greatness of the Trail that benefits the Vietnam Communist Party,
has been paid at an extreme high prices by the Vietnamese people. An
estimate of tens of thousands of North Vietnamese young men and women
civilian porters were killed on the Trail by bombing, sickness and
exhaustion.

Many people wonder why Hanoi could exact so great contribution from
North Vietnamese people. Tens of thousands porters at a time, one
group after another, were transporting military supplies to the south
in spite of danger and hardships. The answer is rather simple. They
didn't feel fear as much as an American or South Vietnamese soldier
did because on the Trail, a porter was fed 700 grams of rice a day and
only rice, while back in their villages, each was rationed 450 grams
of a mixture of 50 percent rice and 50 percent potato or corn. To a
peasant at the time, the rice-only meal was as luxurious as a dinner
in a 5-star hotel to an Westerner.

The extreme large quantity of rice from North Vietnam was transported
on the Ho Chi Minh Trail to the hundreds of logistic bases in South
Vietnam border areas to support North Vietnamese combat units. Much of
it was kept in storage houses and quickly perished by humidity and
bombing. More rice would replenish the stores. That was the reason why
North Vietnamese peasants had to pay tax and fulfil many obligations
that took away about 70 to 80 percent of their crops during the war.

Besides, sophisticated propaganda and intensive indoctrination along
with tight control on food supply are effective tools to mobilize
manpower and other resources to support war effort. In extreme poverty
and under arbitrary powers, man has incredible ability to survive and
can bear every hardship, pain, even death with little fear.

Today, Ho Chi Minh Trail is becoming one of the most exciting routes
for adventure travellers in Vietnam. One can ride on the trail from
Nothern to Danang (about 11 days) or go further, to Saigon (18 days).
Details of the trip are available at http://www.activetravelvietnam.com/t...tail&tourId=22
  #2  
Old February 10th, 2009, 08:27 AM posted to rec.travel.usa-canada
sharx35
external usenet poster
 
Posts: 803
Default Vietnam war - A legendary of the Ho Chi Minh Trail


"Active Travel Vietnam" wrote in message
...
The so-called Ho Chi Minh Trail is one of the most renowned legends
of the Vietnam War. So far, there have been many people outside
Vietnam who have only superficial knowledge on the road system winding
along the Truong Son Range, that facilitated movement of soldiers and
war supplies from North Vietnam to battlefields in South Vietnam. The
Trail was playing the key role in the Communist victory over South
Vietnam.

In the early 2000, the Communist government in Hanoi decided to
construct a highway, the Ho Chi Minh Highway, along the Truong Son
Range to connect North Vietnam with South Vietnam, parallel to the
existing Highway 1 in the coastal areas of Central Vietnam. The
construction is going on, and would be completed in four years if
everything goes as planned.

Prompted by tales of the formidable Ho Chi Minh Trail, many
journalists and observers outside Vietnam quickly adopt the false
notion that the new highway is built on the Ho Chi Minh Trail, or the
Trail is reborn and rebuilt as Ho Chi Minh Highway, without giving it
a second thought.

In fact, the old trail and the new highway ARE NOT AT THE SAME
LOCATION BUT MILES APART.

The Ho Chi Minh Trail was a complex of parallel truck routes and foot
paths.

Most truck routes were dirt roads, some important portions were paved
with rock and pebbles. All of them were in the territory of Laos and
not a bit of it touched the Vietnamese soil except for the first part
of about 50 kilometers from the starting points.

Most convoys departed at three major loading areas inside North
Vietnam’s panhandle region and began their journey by heading to the
Laotian borders, following the three paved highways built before 1945
by the French colonialist authorities in Indochina. All the three
roads connect the Vietnam’s provinces of Nghe An, Ha Tinh and Quang
Binh with the Laotian road network across the common border.

On April 5, 2000, Hanoi government held the ground breaking ceremony
at a ferry harbor in Quang Binh province, to launch the construction
of the Ho Chi Minh Highway. The Xuan Son ferry harbor was one of the
three starting points of the Ho Chi Minh Trail (the southernmost part
of North Vietnam, close to the 17th Parallel - see the map below).

After a short distance into Laos, the trucks headed southward on the
routes along the border. Most of the routes are a few kilometers away
from the border. Far away to the south, the distance may be up to more
than 100 kilometers, deep into Cambodia. The truck routes extended as
far as to Sihanoukville, or Konpong Som, the Cambodian port city on
the Gulf of Thailand. Military supplies also came from North Vietnam
and China to this port to be forwarded to secret bases inside
Cambodia, supporting VC units in South Vietnam. Therefore, the
southern portion of the system was called Sihanouk Trail.

Footpaths made up another system that intertwined with truck routes.
On those footpaths, North Vietnamese combat units moved on foot from
many starting points in areas just north of the Demilitarized Zone
into Laos before infiltrating South Vietnam. Supplies, especially
during the first few years of the war, were also transported to the
South by "dan cong" (civilian labors) on backpacks and mostly on
bicycles led by porters' hands.

Footpaths also extended logistical lines from truck routes. Military
supplies were unloaded from trucks at many sites along the truck
routes and carried by porters on backpacks or on bicycles across
border into South Vietnamese soil.

Like truck routes, footpaths run mostly on Laotian territory parallel
with the border. Only segments of the paths were in South Vietnam no-
man's borderland areas west of Kontum, Pleiku, Ban Me Thuot... down to
Tay Ninh.

Footpath network branched off to the east at many places, leading
supplies and troops to logistical bases set up inside South Vietnam.
Some were located as far as 50 kilometers from the border, deep into
the jungles of Central Vietnam provinces.

The under-construction highway, Ho Chi Minh Highway, is of a
completely different story. It is built entirely inside Vietnam
parallel to the border but not the smallest bit of it is on any
segment of the Ho Chi Minh Trail, truck routes or footpaths. The new
highway intersects with dozen of branched footpaths but runs far away
from the Trail and the border.

The highway construction is not a brand new plan. The idea of the
second north-south highway was nourished by the French colonialist
authorities in the early 20th Century. Before 1954, Highway 14 was
asphalted from its southern end at the Highway 13 (Saigon-Loc Ninh) to
Ban Me Thuot. Its section from Ban Me Thuot up to Daksut, north of
Kontum City, was not asphalted until 1963. The highway from Dak Sut to
Kham Duc was still a 2-lane dirt road.

In 1959, South Vietnam President Ngo Dinh Diem ordered to widen and
reinforce the dirt road to extend the highway from Dak Pek (north of
Dak Sut) to Ben Giang, Quang Nam (70 km southwest of Da Nang). It
would have gone further to A Shau valley and beyond, possibly to Khe
Sanh area. But the outbreak of war in 1961 closed down the project.

The highway now under construction is made up with the existing
Highway 14 that needs some repair after 25 years of poor maintenance;
its extension where abandoned dirt roads require intensive
reconstruction; existing dirt roads from Ben Giang, in A Shau Valley
and other areas that need major upgrading; and the remaining portions
that construction units must open up entirely new roads.

The new highway construction has been opposed by many officials in
Hanoi and deputies of its National Assembly when the plan was
introduced by former Hanoi Prime Minister Vo Van Kiet a few years ago.
The plan would require a budget of nearly US$ 5 billion. In early
2000, Hanoi government decided to go on with the plan which had been
simplified to lower the budget to 3.5 billion dollars. Such budget
seems inadequate to the construction of a highway crossing areas of
heavy rains which often cause floods and landslides.

The Truong Son Trail, or Ho Chi Minh Trail, was a great military
success of the Communists. Massive firepower of the American and South
Vietnamese armed forces failed to stem flows of materiel, supplies and
troops into South Vietnam. Many South Vietnamese strategists contended
that bombings, sporadic land operations or electronic barrier so-
called "McNamara Line" would fail to interdict the enemy movement on
the Trail. According to them, only a defense line of several infantry
divisions across the border, reaching the Mekong River in Laos could
have been effective.

The greatness of the Trail that benefits the Vietnam Communist Party,
has been paid at an extreme high prices by the Vietnamese people. An
estimate of tens of thousands of North Vietnamese young men and women
civilian porters were killed on the Trail by bombing, sickness and
exhaustion.

Many people wonder why Hanoi could exact so great contribution from
North Vietnamese people. Tens of thousands porters at a time, one
group after another, were transporting military supplies to the south
in spite of danger and hardships. The answer is rather simple. They
didn't feel fear as much as an American or South Vietnamese soldier
did because on the Trail, a porter was fed 700 grams of rice a day and
only rice, while back in their villages, each was rationed 450 grams
of a mixture of 50 percent rice and 50 percent potato or corn. To a
peasant at the time, the rice-only meal was as luxurious as a dinner
in a 5-star hotel to an Westerner.

The extreme large quantity of rice from North Vietnam was transported
on the Ho Chi Minh Trail to the hundreds of logistic bases in South
Vietnam border areas to support North Vietnamese combat units. Much of
it was kept in storage houses and quickly perished by humidity and
bombing. More rice would replenish the stores. That was the reason why
North Vietnamese peasants had to pay tax and fulfil many obligations
that took away about 70 to 80 percent of their crops during the war.

Besides, sophisticated propaganda and intensive indoctrination along
with tight control on food supply are effective tools to mobilize
manpower and other resources to support war effort. In extreme poverty
and under arbitrary powers, man has incredible ability to survive and
can bear every hardship, pain, even death with little fear.

Today, Ho Chi Minh Trail is becoming one of the most exciting routes
for adventure travellers in Vietnam. One can ride on the trail from
Nothern to Danang (about 11 days) or go further, to Saigon (18 days).
Details of the trip are available at
http://www.activetravelvietnam.com/t...tail&tourId=22


Interesting but nothing to do with this group, i.e. rec.travel.usa-canada



 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Ho Chi Minh Trail Motorcycle Tours ,Vietnam Motorcycle, MotorbikeTours On HONDA Bikes, South-East Asia dungvictor Latin America 0 October 12th, 2008 04:01 PM
Overland Ho Chi Minh Trail Tour 18daysmHo Chi Minh Trail,VietnamOverland Tours,Adventure Tours in Vietnam dungvictor Latin America 0 September 30th, 2008 02:32 PM
OVERLAND HO CHI MINH TRAIL TOUR by Green Trail Tours dungvictor Latin America 0 August 24th, 2008 08:39 AM


All times are GMT +1. The time now is 09:20 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 TravelBanter.
The comments are property of their posters.